Explore our case studies, policies, and technical documentation. Access the resources that define our commitment to inspection excellence and operational integrity.

Case Studies

Real projects. Real outcomes. Explore how our technical expertise solves complex inspection challenges.

Policies

Terms of use, privacy policy, quality standards, and compliance documentation.

Featured Case Studies

Real projects. Real outcomes. Explore how our technical expertise solves complex inspection and quality challenges across the energy value chain.

Pipeline NDT

Gas Transmission Pipeline NDT Campaign

Full-scope NDT inspection for a gas transmission pipeline project covering RT, UT, and MT weld examination

1,200 Welds Inspected
98.5% Yield First Pass
45 Days Project Duration
Zero Incidents Safety Record
View more
Offshore

Offshore Platform Structural NDT Inspection

Advanced PAUT and TOFD inspection for structural welds on an offshore production platform

240 Nodes Inspected
3 Platforms Covered
60 Days Campaign
100% Data Coverage
View more
Refinery QA/QC

Refinery Turnaround Quality Surveillance

QA/QC management during a planned refinery turnaround covering pressure vessels, heat exchangers, and piping systems

180 Hold Points Witnessed
25 Inspectors Deployed
21 Days Shutdown
Zero NCRs Major
View more
Storage Tanks

Crude Oil Storage Tank Inspection Program

API 653 internal inspection and fitness-for-service assessment for a tank farm

6 Tanks Inspected
10 Years Life Extension
30 Days Campaign
100% Compliant API 653
View more
Integrity

Pipeline Integrity Management Program

ILI verification digs and direct assessment for a hydrocarbon transmission pipeline system

15 Digs Verified
3 Months Program
95% Accuracy ILI Match
100% Compliance Regulatory
View more
FFS Assessment

Pressure Vessel Fitness-for-Service Assessment

API 579 fitness-for-service evaluation for multiple pressure vessels in a gas processing plant

8 Vessels Assessed
L2 FFS Level
4 Weeks Project
Yes Life Extended
View more
Wellhead

Wellhead & Christmas Tree Inspection

Visual and dimensional inspection of surface wellhead equipment across multiple oil field locations

12 Wellheads Inspected
3 Fields Mobilized
2 Weeks Duration
100% Pass Acceptance
View more
CUI Management

Corrosion Under Insulation Assessment

Systematic CUI inspection program for insulated piping systems in a petrochemical facility

5,000 m Piping
80% Detection CUI Accuracy
6 Months Program
Yes Plan Delivered
View more
Construction QA

Gas Processing Facility QA/QC Program

Third-party quality assurance for the construction phase of a gas processing facility expansion

6 Months Project
15 Audits Conducted
100% ITRs Completed
On Schedule Delivered
View more