Project Overview

AETERNA provided advanced NDT services for a 20 km cross-country high-pressure pipeline project. Our scope included automated ultrasonic testing (AUT), conventional UT, radiography, MPI, and visual inspection for girth welds, mainline welds, and tie-in connections.

01
Welds Tested

8,000+ girth welds inspected with AUT and RT

02
Technology

Phased array AUT with real-time data analysis

03
Acceptance

99.2% first-pass acceptance across all weld categories

Challenge

The Challenge

Remote locations and challenging terrain made equipment mobilization difficult. The project required 100% AUT of all girth welds with rapid reporting. Coordination with multiple welding crews required flexible scheduling.

Welding production rates of up to 120 joints per day required NDT to keep pace - any delay could halt the entire construction spread.
Solution

Our Solution

We mobilized two AUT systems with phased array technology and experienced technicians. On-site radiography and conventional UT backed up AUT results. Digital reporting enabled real-time weld quality tracking. Our team completed over 8,000 weld inspections with 99.2% first-pass acceptance rate.

1

Mobilization

Two AUT systems with calibration labs. Backup RT and UT at strategic locations

2

Operations

24/7 inspection aligned with welding shifts. Real-time data review

3

Reporting

Digital weld quality dashboard with daily productivity reports

Results

Key Results

Measurable outcomes delivered through our technical expertise and commitment to quality.

8,000+
Welds
99.2%
Yield
20 km
Pipeline
45+
Technicians